Attribute
Message class | 6P | ||
Short Description | Messages for planned independent requirements (Appl.area 60) | ||
Message Number | 030 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Help Document
Diagnosis
The requirements typs is not defined as a strategy for the material in the strategy group.
System Response
The strategies allowed for planning a material are recorded in Customizing for demand management in the strategy group. The strategy group can either be allocated to the material in the material master record, either directly or via the MRP group. The system uses the strategy group to find the correct requirements type when creating or changing planned independent requirements.
If you enter a requirements type that is not included in the strategy group, the system displays a warning or an error message.
Note
If you entered a strategy group in the material master record, you must enter a requirements type in the requirements type field.
Here, the system determines the requirements type that was entered as the main strategy in the strategy group and proposes this value.
This default value can be overwritten by one of the alternative strategies in the strategy group, if lore strategies were defined.
Procedure
- Check the strategy group or the MRP group in the material master record. Does the strategy group contain the strategies or the requirement type that you require?
Proceed
- If necessary, check the strategy groups in Customizing. Does the strategy group contain the strategies you require?
Proceed
- If necessary, check the allocations of the strategy groups to the MRP groups in Customizing.
Proceed
History
Last changed on/by | 20100310 | SAP | |
SAP Release Created in |