SAP ABAP Message Class 5R Message Number 229 (The scheme-plan mapping is not valid for the entire grant period)
Hierarchy
☛
SAP_HRCSG (Software Component) Sub component SAP_HRCSG of SAP_HR
⤷ PA-PA-SG (Application Component) Singapore
⤷ PB25 (Package) HR Singapore: Master data
⤷ PA-PA-SG (Application Component) Singapore
⤷ PB25 (Package) HR Singapore: Master data
Attribute
Message class | 5R | ||
Short Description | HR-SG: Messages for HR Module SG, China, Hongkong and Taiwan | ||
Message Number | 229 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20020717 |
Message Text
The scheme-plan mapping is not valid for the entire grant period
Help Document
Diagnosis
The scheme selected for the grant may not be valid for the entire
period of the grant record
System Response
Procedure
Check the validity period of the scheme and plan mapping in
V_t5rsop_pl_sch.
Change the grant and expiry date if necessary
Procedure for System Administration
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |