SAP ABAP Message Class 5C Message Number 754 (Validity periods overlap or are incomplete)
Hierarchy
☛
SAP_HRCCH (Software Component) Sub component SAP_HRCCH of SAP_HR
⤷ PA-PA-CH (Application Component) Switzerland
⤷ PB02 (Package) HR Master Data: Switzerland
⤷ PA-PA-CH (Application Component) Switzerland
⤷ PB02 (Package) HR Master Data: Switzerland
Attribute
Message class | 5C | ||
Short Description | HR: Messages for Switzerland | ||
Message Number | 754 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 19970922 |
Message Text
Validity periods overlap or are incomplete
Help Document
Diagnosis
The validity periods for the method variants overlap or are incomplete.
A method variant must exist in the rule for every time.
System Response
Procedure
Check the method variants.
Procedure for System Administration
History
Last changed on/by | 20110809 | SAP | |
SAP Release Created in |