SAP ABAP Message Class 5C Message Number 717 (Fund '&1' has the same PC assignment as fund '&2')
Hierarchy
☛
SAP_HRCCH (Software Component) Sub component SAP_HRCCH of SAP_HR
⤷
PA-PA-CH (Application Component) Switzerland
⤷
PB02 (Package) HR Master Data: Switzerland

⤷

⤷

Attribute
Message class | ![]() |
5C | |
Short Description | ![]() |
HR: Messages for Switzerland | |
Message Number | ![]() |
717 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
19970922 |
Message Text
Fund '&1' has the same PC assignment as fund '&2'
Help Document
Diagnosis
The PC assignment of fund was transfered unchanged from model fund .
an individual processing plan and an individual PC parameter area determination are to be set in the rule for a new fund. This is especially the case if an SAP object (SAP namespace) is used as the model.
In special cases - eg if several similar funds should be set by definition - it can be sensible to have one with the model fund, agreeing PC assignment.
System Response
Procedure
Maintain the PC assignment: Enter a processing_plan and a parameter_area_determination_grouping in the client namespace.
History
Last changed on/by | ![]() |
20110809 | SAP |
SAP Release Created in |