SAP ABAP Message Class 5C Message Number 622 (Posting date is not within validity period of account.)
Hierarchy
☛
SAP_HRCCH (Software Component) Sub component SAP_HRCCH of SAP_HR
⤷ PA-PA-CH (Application Component) Switzerland
⤷ PB02 (Package) HR Master Data: Switzerland
⤷ PA-PA-CH (Application Component) Switzerland
⤷ PB02 (Package) HR Master Data: Switzerland
Attribute
Message class | 5C | ||
Short Description | HR: Messages for Switzerland | ||
Message Number | 622 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Posting date is not within validity period of account.
Help Document
Diagnosis
The posting date is not in the validity period ( to ) for current account .
System Response
The posting can not be created.
Procedure
Change the posting date so that it is in the validity period for the account.
If necessary you can change the validity period for the account. For this you need an extended account authorization.
History
Last changed on/by | 20110809 | SAP | |
SAP Release Created in |