SAP ABAP Message Class 5C Message Number 455 (The executed PC activity was cancelled after &1 steps)
Hierarchy
SAP_HRCCH (Software Component) Sub component SAP_HRCCH of SAP_HR
   PA-PA-CH (Application Component) Switzerland
     PB02 (Package) HR Master Data: Switzerland
Attribute
Message class 5C  
Short Description HR: Messages for Switzerland    
Message Number 455  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20010712   
Message Text
The executed PC activity was cancelled after &1 steps
Help Document

Diagnosis

The executed PC activity is too long and was cancelled.

Procedure

Change the executed PC activity so that fewer than processing steps are required.

If necessary, group several operations together in a customer-specific operation (S7) in connection with a customer exit.

History
Last changed on/by 20110809  SAP 
SAP Release Created in