SAP ABAP Message Class 2054ALE Message Number 022 (Assignments to project definition only allowed in WBS master system)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-ST-OPR (Application Component) Operative Structures
⤷ CNIF (Package) External 'Interface for Project Management System (PS)'
⤷ PS-ST-OPR (Application Component) Operative Structures
⤷ CNIF (Package) External 'Interface for Project Management System (PS)'
Attribute
Message class | 2054ALE | ||
Short Description | ALE for projects | ||
Message Number | 022 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 19980514 |
Message Text
Assignments to project definition only allowed in WBS master system
Help Document
Diagnosis
You have tried to assign the project derfinition to the current object, although the project definition was created in another master system.
System Response
Procedure
Assign the object a project definition, whose master system is the the current system.
History
Last changed on/by | 19980429 | SAP | |
SAP Release Created in |