SAP ABAP Message Class 06 Message Number 807 ("Latest acceptable GR" date exceeded by a schedule line)
Hierarchy
BBPCRM (Software Component) BBPCRM
   SRM-EBP (Application Component) Enterprise Buyer
     BBP_APPLICATION (Package) Structure Package EBP
       ME (Package) Application development R/3 Purchasing
Attribute
Message class 06  
Short Description Purchasing Document    
Message Number 807  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
"Latest acceptable GR" date exceeded by a schedule line
Help Document

Diagnosis

You have processed either a schedule line or the "Latest GR" date.

  • Schedule line
    The schedule line delivery date is later than the "Latest GR" date.
  • "Latest GR" date
    The "Latest GR" date is earlier than an already existing schedule line delivery date.

If a goods receipt occurs after the "Latest GR" date, the system will issue either a warning or an error message (depending on the setting in Customizing). In the case of an error message, the goods receipt cannot be posted.

System Response

Procedure

History
Last changed on/by 20130531  SAP 
SAP Release Created in