SAP ABAP Message Class /TDAG/CPM_IMPORT Message Number 142 (Rest calculation is carried out only for percent units; &1)
Hierarchy
TDAGBCA (Software Component) TechniData Basic Components
   EHS (Application Component) Environment, Health and Safety
     /TDAG/CP (Package) Compliance for products
Attribute
Message class /TDAG/CPM_IMPORT  
Short Description CP: import messages    
Message Number 142  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141109   
Message Text
Rest calculation is carried out only for percent units; &1
Help Document

Diagnosis

A rest value of a component is calculated for the composition when the value in Customizing of the component execption for residue is RE. This rest value is written in the component of the composition with a configured exception value.

The unit of the composition must be percent or a dimension of percent.

System Response

Procedure

If the unit has the dimension of percent, configure your units of measurement.

Procedure for System Administration

In the Customizing activity Specify Environment Parameters for Back-End Processes, check the settings for the environment parameter PDB_COMP_EXCEPTION_RESIDUE.

History
Last changed on/by 20141109  SAP 
SAP Release Created in   0207B0406C