SAP ABAP Message Class /SAPPCE/PNV Message Number 304 (Non-invoiced work completed is negative)
Hierarchy
☛
EA-FIN (Software Component) EA-FIN
⤷ PS-REV-CPR (Application Component) Construction Progress Report
⤷ /SAPPCE/PNV (Package) Construction Progress Report and Valuation
⤷ PS-REV-CPR (Application Component) Construction Progress Report
⤷ /SAPPCE/PNV (Package) Construction Progress Report and Valuation
Attribute
Message class | /SAPPCE/PNV | ||
Short Description | Construction Progress Report and Valuation | ||
Message Number | 304 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20020214 |
Message Text
Non-invoiced work completed is negative
Help Document
Diagnosis
The work completed that has not been invoiced, that is, the difference between the total work completed up to the results analysis period as per the construction progress report and the invoiced work up to the results analysis period is . This amount is greater than the maximum rounding error of entered in Customizing for construction site valuation. An inventory valuation based on the negative non-invoiced work completed is not possible.
System Response
- If the message is an error message, valuation is not carried out.
- If the message is an information or warning message, the non-invoiced work is set to zero for the valuation.
Procedure
Procedure for System Administration
You can control this message in Customizing for Construction Progess Report and Valuation under Change Message Control.
History
Last changed on/by | 20030113 | SAP | |
SAP Release Created in | 470 |