SAP ABAP Message Class /SAPPCE/PNV Message Number 003 (Construction progress reports already exist)
Hierarchy
EA-FIN (Software Component) EA-FIN
   PS-REV-CPR (Application Component) Construction Progress Report
     /SAPPCE/PNV (Package) Construction Progress Report and Valuation
Attribute
Message class /SAPPCE/PNV  
Short Description Construction Progress Report and Valuation    
Message Number 003  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20021030   
Message Text
Construction progress reports already exist
Help Document

Diagnosis

You want to change the validity indicator for the construction progress report, although construction progress reports already exist.

System Response

Procedure

  • If the message is an error message, you cannot change the indicator.
  • If the message is an information or warning message, you can change the indicator.

Procedure for System Administration

You can control this message in Customizing for

Construction Progress Report and Valuation under Change Message Control

History
Last changed on/by 20030113  SAP 
SAP Release Created in   470