SAP ABAP Message Class /SAPPCE/JVAM1 Message Number 043 (Valid-from date must lie after &1)
Hierarchy
☛
EA-FIN (Software Component) EA-FIN
⤷
CA-JVA-PRC (Application Component) Project Risk Management for Contractors
⤷
/SAPPCE/JVA (Package) Joint Venture Accounting: E&C Enhancements
⤷
⤷
Attribute
| Message class | /SAPPCE/JVAM1 | ||
| Short Description | JVA messages for PCE | ||
| Message Number | |
043 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On | 20021010 |
Message Text
Valid-from date must lie after &1
Help Document
Diagnosis
You cannot enter a valid-from date that lies before the valid-from date for equity groups already existing for this joint venture.
System Response
Procedure
Enter a valid-from date for the equity group that lies after .
Procedure for System Administration
History
| Last changed on/by | 20030305 | SAP | |
| SAP Release Created in | 471 |