SAP ABAP Message Class /SAPMP/PP_BD Message Number 004 (Fixed scrap first and last length values were deleted)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-MP-PP (Application Component) Production Planning and Control (PP) enhancements
⤷ /SAPMP/PP-BD (Package) Mill Products Enhancements: Production Planning Basic Data
⤷ IS-MP-PP (Application Component) Production Planning and Control (PP) enhancements
⤷ /SAPMP/PP-BD (Package) Mill Products Enhancements: Production Planning Basic Data
Attribute
Message class | /SAPMP/PP_BD | ||
Short Description | MillCa Production Planning Master Data | ||
Message Number | 004 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20050301 |
Message Text
Fixed scrap first and last length values were deleted
Help Document
Diagnosis
You tried to create or change a bill of material (BOM) or a routing. This is not possible because at least one of the fields Fixed Scrap First Length or Fixed Scrap Last Length contains a value. These fields must be blank for the length calculation method that you selected.
System Response
The system deletes the values from the above fields and changes their status to not ready for input.
Procedure
To use these fields again, you have to select a different length calculation method.
Procedure for System Administration
History
Last changed on/by | 20050301 | SAP | |
SAP Release Created in | 471 |