SAP ABAP Message Class /MRSS/SGU Message Number 206 (&1 is not a valid planning node and will not be loaded)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷
PM-WOC-MO (Application Component) Maintenance Orders
⤷
/MRSS/SGU (Package) User Interface for Interactive Planning Board

⤷

⤷

Attribute
Message class | ![]() |
/MRSS/SGU | |
Short Description | ![]() |
Error Messages for User Interface | |
Message Number | ![]() |
206 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20141109 |
Message Text
&1 is not a valid planning node and will not be loaded
Help Document
Diagnosis
The system displays this message if you attempt to add a resource planning node that is not integrated into SAP Multiresource Scheduling.
System Response
Procedure
To integrate the resource planning node:
- Check whether the specified resource planning node is valid.
- Check whether the specified resource planning node is integrated into SAP Multiresource Scheduling.
- You can use report /MRSS/SGE_PN_MNT to transfer the resource planning node to SAP Multiresource Scheduling.
Procedure for System Administration
History
Last changed on/by | ![]() |
20141109 | SAP |
SAP Release Created in | 401 |