Message class | /ISDFPS/FDP | ||
Short Description | Force and Deployment Planner | ||
Message Number | 350 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20050409 |
Message Text
Help Document
Diagnosis
When a contingent period is changed, the structure of this contingent, and possibly that of the previous or subsequent contingent, must also be adjusted if operational/exercise relationships have already been created for the period between the old and new start and end dates. The start and end dates of the relationships are adjusted in line with the change to the contingent periods.
However, the period of a relationship can be changed only if the status of the relationship is "Planned".
At least one of the relationships affected by the change to the contingent period, however, already has a status higher than "Planned".
System Response
To avoid inconsistencies, the system does not permit the contingent period to be changed to the dates selected.
Procedure
First, reject the relationships that have a higher status and change their statuses back to "Planned", or delete them. Alternatively, in certain circumstances, relationships can be delimited accordingly so that they no longer intersect the change period.