SAP ABAP Message Class /ISDFPS/FDP Message Number 328 (Start date for the assignment to "&1" (&2) must be after &3)
Hierarchy
EA-DFPS (Software Component) SAP Enterprise Extension Defense Forces & Public Security
   IS-DFS-OF-FDP (Application Component) Structures Workbench
     /ISDFPS/FDP (Package) Armed Forces and Deployment Planning
Attribute
Message class /ISDFPS/FDP  
Short Description Force and Deployment Planner    
Message Number 328  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20050409   
Message Text
Start date for the assignment to "&1" (&2) must be after &3
Help Document

Diagnosis

The start date of the selected assignment to a contingent must not be before a specific date. This value is equal to the maximum of the start date of the relevant operation/exercise contingent, start date of the corresponding operation/exercise contingent relationship of the higher-level force element, start date of the force element to be assigned, and the current date.

System Response

You are not allowed to create an assignment with a start date that is before the minimum start date described.

Procedure

Select a start date that is after or the same as the minimum start date permitted.

Procedure for System Administration

History
Last changed on/by 20091125  SAP 
SAP Release Created in   10A