SAP ABAP Interface IWCI_IOS_TEST_MSPROJECT (WebDynpro Interface COMPONENTCONTROLLER)
Hierarchy
☛ SAP_UI (Software Component) User Interface Technology
   ⤷ BC-WD-ACF (Application Component) Bitte Unterkomponenten verwenden (Hinweis 1665488)
     ⤷ SIOS (Package) Integrated office suites
Properties
Interface IWCI_IOS_TEST_MSPROJECT  
Short Description WebDynpro Interface COMPONENTCONTROLLER    
General Data
Package SIOS   Integrated office suites 
Created 20090514   SAP 
Last changed 20110908   SAP 
Unicode checks active    
Forward declarations
Interface IWCI_IOS_TEST_MSPROJECT has no forward declaration.
Interfaces
Interface IWCI_IOS_TEST_MSPROJECT has no interface.
Friends
Interface IWCI_IOS_TEST_MSPROJECT has no friend.
Attributes
Interface IWCI_IOS_TEST_MSPROJECT has no attribute.
Methods
# Method Level Visibility Method type Description Created on
1 WD_GET_API Instance method Public Method 20090514
Events
Interface IWCI_IOS_TEST_MSPROJECT has no event.
Types
Interface IWCI_IOS_TEST_MSPROJECT has no local type.
Method Signatures

Method WD_GET_API Signature

# Type Parameter Pass Value Optional Typing Method Associated Type Default value Description Created on
1 Returning RESULT Value transfer Object reference (TYPE REF TO) IF_WD_CONTROLLER 20090514

Method WD_GET_API on Interface IWCI_IOS_TEST_MSPROJECT has no exception.
History
Last changed by/on SAP  20110908 
SAP Release Created in