SAP ABAP Interface /MRSS/IF_SGE_WC_SCHED (Interface for BAdI: /MRSS/SGE_WC_SCHED)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
Meta Relationship - Used By
# Relationship type Used by Short Description Created on
1 Interface implementation (CLASS c. INTERFACES i_ref)  /MRSS/CL_SGE_IMPL_WC_SCHED Class for BAdI: /MRSS/SGE_WC_SCHED 20130325
Properties
Interface /MRSS/IF_SGE_WC_SCHED  
Short Description Interface for BAdI: /MRSS/SGE_WC_SCHED    
General Data
Package /MRSS/SGE   Multiresource Planning: Scheduling Engine 
Created 20130325   SAP 
Last changed 20141109    
Unicode checks active    
Forward declarations
Interface /MRSS/IF_SGE_WC_SCHED has no forward declaration.
Interfaces
# Interface Abstract Final Description Created on
1 IF_BADI_INTERFACE Tag Interface for BAdIs 20130325
Friends
Interface /MRSS/IF_SGE_WC_SCHED has no friend.
Attributes
Interface /MRSS/IF_SGE_WC_SCHED has no attribute.
Methods
# Method Level Visibility Method type Description Created on
1 SEQUENCE_DEMANDS Instance method Public Method Sequence the demands 20130325
Events
Interface /MRSS/IF_SGE_WC_SCHED has no event.
Types
Interface /MRSS/IF_SGE_WC_SCHED has no local type.
Method Signatures

Method SEQUENCE_DEMANDS Signature

# Type Parameter Pass Value Optional Typing Method Associated Type Default value Description Created on
1 Changing CT_DEMANDS Call by reference Type reference (TYPE) /MRSS/T_DEM_ITEM_STR_TAB Table of demand items in structure representation 20130325

Method SEQUENCE_DEMANDS on Interface /MRSS/IF_SGE_WC_SCHED has no exception.
History
Last changed by/on SAP  20141109 
SAP Release Created in 800