Hierarchy
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WSRP (Package) Retail: Store Replenishment
Basic Data
Data Element | WSRP_ROUNDRQ |
Short Description | Round Replenishment Requirement to Logical Unit of Measure |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1_X | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Rounding |
Medium | 20 | Round requirements |
Long | 40 | Round replen. req. to unit of measure |
Heading | 50 | Round replen. req. to logical unit of measure |
Documentation
Definition
Flag this indicator if you want to round up the replenishment requirements determined by the system to logical units of measure.
Supplementary Documentation - WSRP_ROUNDRQ0002
Notes
Only the replenishment requirements for single materials and header materials are rounded to structured materials, as only these replenishment requirements are rounded when follow-on documents are generated. The replenishment requirements for components of structured materials are converted into header materials when the replenishment requirements are calculated.
If you round the replenishment requirements at the end of the replenishment requirement calculation, you cannot round the replenishment requirements when follow-on documents are generated.
Rounding data can lead to errors and incorrect data.
Use
In the three-step replenishment method, the rounding parameters, the source of supply and all master data has to be determined if the replenishment requirements are to be rounded when the replenishment requirement calculation is run, when the data for the replenishment requirement calculation is generated or when the replenishment requirement is calculated.
In the two-step replenishment method, the rounding parameters, the source of supply and all master data must be determined if the replenishment requirements are to be rounded when the replenishment requirement calculation is run.
Dependencies
Example
Supplementary Documentation - WSRP_ROUNDRQ0003
Notes
If you round the replenishment requirements when the replenishment requirement calculation is complete, the replenishment requirements can no longer be rounded when follow-on documents are generated.
Rounding data for a second time can lead to incorrect data and errors.
Use
In the three-step replenishment method, the rounding parameters, the source of supply and all master data must be determined when the data for replenishment requirement calculation is generated or when the follow-on documents are generated.
In the two-step replenishment method, the rounding parameters, the source of supply and the general material master data must be determined if the replenishment requirements are to be rounded when follow-on documents are generated.
Dependencies
Example
History
Last changed by/on | SAP | 20011002 |
SAP Release Created in | 46C |