SAP ABAP Data Element WSRP_PLDAY (Planning Date)
Hierarchy
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
   MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
     WSRP (Package) Retail: Store Replenishment
Basic Data
Data Element WSRP_PLDAY
Short Description Planning Date  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short Plg dte 
Medium 13 Planning Date 
Long 13 Planning Date 
Heading Plg dte 
Documentation

Definition

Date for which replenishment planning is to be carried out.

Notes

If you schedule replenishment planning as a job, it may be that the replenishment run is not started until after midnight. If this is the case, you can tell the process the correct date using the Planning Date.

If an ATP check takes place for a material in the replenishment (WRP1), today's date is used instead of the planning date. This prevents inconsistencies in the ATP check, as the scheduling of the ATP check is based on today's date.

In multi-step replenishment the planning date is taken into account for the ATP check so that inconsistencies do not occur during scheduling. That means that today's date no longer needs to be used for scheduling the ATP check.

History
Last changed by/on SAP  20011002 
SAP Release Created in 110