SAP ABAP Data Element WSRP_MARADATA (Determine General Material Master Data)
Hierarchy
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
   MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
     WSRP (Package) Retail: Store Replenishment
Basic Data
Data Element WSRP_MARADATA
Short Description Determine General Material Master Data  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR1_X    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Mat.master 
Medium 20 Material Master Data 
Long 40 General Material Master Data 
Heading 50 General Material Master Data 
Documentation

Definition

Indicates that the general material master data that is required when calculating requirements data is determined.

The general material master data required includes:

  • Base unit of measure for the material in question
  • Material group for the material
  • Status information for the material
  • Whether or not the material is a structured material
  • General material master data for determining rounding parameters

If you select material-customer combinations using the material groups, you also have to determine general material master data.

Supplementary Documentation - WSRP_MARADATA0001

Use

In the three-step replenishment method, you can determine the general material master data when you determine the data for a) the replenishment requirement calculation or b) when follow-on documents are generated. This means that the indicator must be set for one of these steps.

If the indicator is set for a), the general material master data for both a) and b) are stored temporarily so that system performance is optimized when the material master data is determined.

If the general material master data is determined at a), changes to the general material master data are not included if they were generated between processes a) and b).

Dependencies

Example

Supplementary Documentation - WSRP_MARADATA0002

Use

In the three-step replenishment method, you can determine the general material master data when you determine the data for a) the replenishment requirement calculation or b) when follow-on documents are generated. This means that the indicator must be set for one of these steps.

If the indicator is set for a), the general material master data for both a) and b) is stored temporarily so that system performance is optimized when the material master data is determined.

If the general material master data is determined at a), changes to the general material master data are not included if they were generated between processes a) and b).

In the two-step replenishment method, the general material master data must be determined when the replenishment requirements are determined.

Dependencies

Example

Supplementary Documentation - WSRP_MARADATA0003

Use

In the three-step replenishment method, you can determine the general material master data when you determine the data for a) the replenishment requirement calculation or b) when follow-on documents are generated. This means that the indicator must be set for one of these steps.

If the indicator is set for a), the general material master data for both a) and b) is stored temporarily so that system performance is optimized when the material master data is determined.

If the general material master data is determined at a), changes to the general material master data are not included if they were generated between processes a) and b).

In the two-step replenishment method, the general material master data must be determined when the follow-on documents are generated.

Dependencies

Example

History
Last changed by/on SAP  20011002 
SAP Release Created in 46C