SAP ABAP Data Element WSRP_ATP (Include Planned Issues/Receipts)
Hierarchy
☛
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WSRP (Package) Retail: Store Replenishment
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WSRP (Package) Retail: Store Replenishment
Basic Data
Data Element | WSRP_ATP |
Short Description | Include Planned Issues/Receipts |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1_X | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | IncludeATP |
Medium | 20 | Include Issues/Rcpts |
Long | 30 | Include Issues/Receipts |
Heading | 50 | Include Planned Issues/Receipts |
Documentation
Definition
Indicates that the planned issues and receipts are taken into consideration when requirements are calculated.
Notes
If you want to include planned issues and receipts in your calculation, ensure that the planned issues and receipts are calculated using ATP when the requirement calculation data is determined or when the calculation is run. If you do not define the planned issues and receipts when you calculating your requirements or when defining the necessary data for the calculation, the system may use out-of-date values for the calculation.
In the two-step method, you must define the planned issues and receipts using ATP if you want to take them into account in your calculation.
History
Last changed by/on | SAP | 20011002 |
SAP Release Created in | 46C |