Hierarchy
⤷ LO-MD-PPW (Application Component) Price Planning Workbench
⤷ WRF_PPW_DDIC (Package) Price Planning Workbench - DDIC
Basic Data
Data Element | WRF_PPW_PROPROTGVG |
Short Description | Past Period for Conflict Check Against Promotion Price Plans |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WRF_PPW_NUMBER_DAYS | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CheckDays |
Medium | 16 | Check No. Days |
Long | 30 | Number of Days for Conf. Check |
Heading | 15 | Check No. Days |
Documentation
Definition
Interval in days for the conflict check of a promotion price plan against other promotion price plans. The start of this time interval is calculating by back-dating the validity start date of the current promotion price plan by this number of days; the end of the time interval is the validity start date of the price plan.
Use
During the conflict check, the system takes all promotion price plans into account that do not have status Cancelled or Flagged for Deletion and whose validity start dates lie in this time interval.
Because you can extend the validity of promotion price plans, the system also takes promotion price plans into account that end before the validity start date of the current promotion price plan.
Dependencies
You set the flag Conflict Check Against Promotion Price Plans.
Example
You have configured a past period of ten days. If the validity start date of a promotion price plan is January 15 of a year, the time interval for the check begins on January 5 of that year.
History
Last changed by/on | SAP | 20041209 |
SAP Release Created in | 111 |