SAP ABAP Data Element WRF_PPW_MDPMDPDAYS (Minimum Interval (in Days) to Next Markdown)
Hierarchy
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
   LO-MD-PPW (Application Component) Price Planning Workbench
     WRF_PPW_DDIC (Package) Price Planning Workbench - DDIC
Basic Data
Data Element WRF_PPW_MDPMDPDAYS
Short Description Minimum Interval (in Days) to Next Markdown  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WRF_PPW_NUMBER_DAYS    
Data Type NUMC   Character string with only digits 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Min. Lead 
Medium 16 Min. Lead Time 
Long 40 Minimum Lead Time to Markdowns 
Heading 15 Min. Lead Time 
Documentation

Definition

Within the conflict check, defines the number of days that have to lie between the validity start dates of two markdown price plans.

Use

When a markdown price plan is created, the system outputs a warning message if another markdown price plan exists whose validity start date is closer to the validity start date of the markdown price plan than the defined number of days.

The system also outputs warning messages after the start of the existing price plan if the interval to the validity start date of another markdown price plan is less than the defined number of days.

During the conflict check, the system takes all markdown price plans into account that do not have status Cancelled or Flagged for Deletion.

Dependencies

You set the flag Conflict Check Against Markdown Price Plans.

Example

You set the interval to one day. If you try to create a markdown price plan that is to start on January 14 of a given year, the system will output a warning message if another markdown price plan exists that starts on January 15 of that year.

History
Last changed by/on SAP  20041209 
SAP Release Created in 111