SAP ABAP Data Element WRF_PPW_MDPMANTGVG (Past Period for Conflict Check Against Manual Price Plans)
Hierarchy
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
   LO-MD-PPW (Application Component) Price Planning Workbench
     WRF_PPW_DDIC (Package) Price Planning Workbench - DDIC
Basic Data
Data Element WRF_PPW_MDPMANTGVG
Short Description Past Period for Conflict Check Against Manual Price Plans  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WRF_PPW_NUMBER_DAYS    
Data Type NUMC   Character string with only digits 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 CheckDays 
Medium 16 Check No. Days 
Long 30 Number of Days for Conf. Check 
Heading 15 Check No. Days 
Documentation

Definition

Interval in days for the conflict check of a markdown price plan against manual price plans. The start of this time interval is calculating by back-dating the validity start date of the markdown price plan by this number of days; the end of the time interval is the validity start date of this price plan.

Use

During the conflict check, the system only takes manual price plans into account that have status Active and whose validity start date lies within this interval.

Dependencies

You set the flag Conflict Check Against Manual Price Plans

Example

You have configured a past period of ten days. If the validity start date of a markdown price plan is January 15 of a year, the time interval for the check begins on January 5 of that year.

History
Last changed by/on SAP  20041209 
SAP Release Created in 111