SAP ABAP Data Element WRF_PPW_MANPRODAYS (Minimum Interval (in Days) to Next Promotion Plan)
Hierarchy
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
   LO-MD-PPW (Application Component) Price Planning Workbench
     WRF_PPW_DDIC (Package) Price Planning Workbench - DDIC
Basic Data
Data Element WRF_PPW_MANPRODAYS
Short Description Minimum Interval (in Days) to Next Promotion Plan  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WRF_PPW_NUMBER_DAYS    
Data Type NUMC   Character string with only digits 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Min. Lead 
Medium 16 Min. Lead Time 
Long 40 Minimum Lead Time to Promotion Plans 
Heading 15 Min. Lead Time 
Documentation

Definition

Within the conflict check, defines the number of days that have to lie between the validity start date of a markdown price plan and that of a promotion price plan.

Use

When a manual price plan is created, the system outputs a warning message if a promotion price plan already exists whose validity start date is closer to the validity start date of the manual price plan than the defined number of days.

During the conflict check, the system takes all promotion price plans into account that do not have status Cancelled or Flagged for Deletion.

Dependencies

You set the flag Conflict Check Against Manual Prices.

The system also outputs warning messages after the validity end date of a promotion price plan. You can define the corresponding number of days in group frame Settings for Promotion Price Plans under Minimum Number of Days to Following Manual Price Changes. The system uses this value even if you do not set the conflict check flag.

Example

You set the interval to one day. If you try to create a manual price plan that is to start on January 14 of a given year, the system will output a warning message if a promotion price plan exists that starts on January 15 of that year.

History
Last changed by/on SAP  20041209 
SAP Release Created in 111