Hierarchy
⤷ LO-MD-PPW (Application Component) Price Planning Workbench
⤷ WRF_PPW_DDIC (Package) Price Planning Workbench - DDIC
Basic Data
Data Element | WRF_PPW_MANMDPDAYS |
Short Description | Minimum Interval (in Days) to Next Markdown |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WRF_PPW_NUMBER_DAYS | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Min. Lead |
Medium | 16 | Min. Lead Time |
Long | 40 | Minimum Lead Time to Markdowns |
Heading | 15 | Min. Lead Time |
Documentation
Definition
Within the conflict check, defines the number of days that have to lie between the validity start date of manual price plans and that of markdown price plans.
Use
When a manual price plan is created, the system outputs a warning message if a markdown price plan already exists whose validity start date is closer to the validity start date of the manual price plan than the defined number of days.
During the conflict check, the system takes all markdown price plans into account that do not have status Cancelled or Flagged for Deletion.
Dependencies
You set the flag Conflict Check Against Manual Prices.
In group frame Settings for Markdown Price Plans, under Minimum Number of Days to Following Manual Price Plans, you can define the minimum number of days that have to lie between the validity start date of a markdown price plan and a manual price plan. The system uses this value even if you do not set the conflict check flag.
Example
You set the interval to one day. If you try to create a manual price plan that is to start on January 14 of a given year, the system will output a warning message if a markdown price plan exists that starts on January 15 of that year.
History
Last changed by/on | SAP | 20041209 |
SAP Release Created in | 111 |