SAP ABAP Data Element WRF_PPW_DAYS_ADVANCE (Lead Days for Calculating Price Plan Activation)
Hierarchy
☛
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
⤷
LO-MD-PPW (Application Component) Price Planning Workbench
⤷
WRF_PPW_DDIC (Package) Price Planning Workbench - DDIC

⤷

⤷

Basic Data
Data Element | WRF_PPW_DAYS_ADVANCE |
Short Description | Lead Days for Calculating Price Plan Activation |
Data Type
Category of Dictionary Type | Direct Type Entry | |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ||
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Lead Days |
Medium | 15 | Lead Days |
Long | 20 | Lead Days |
Heading | 11 | Lead Days |
Documentation
Definition
Defines the number of days to pre-date the time interval, to determine the price plan to activate. The specified number of days is added to both limits of the selection period.
If you do not specify the selection period explicitly, the system checks all price plans that contain items whose validity start date is the same as the current date. In this case, the system shifts the end of the selection period in to the future by the defined number of days.
Use
Dependencies
Example
- You defined two lead days and no time constraints.
When you run the program for price plan activation on October 15 of a year, the system activates the price plans that will be active up to October 17.
- You defined two lead days and specified a selection interval from October 15-20 of a year.
The program activates all price plans that contain items that will become active between October 17 and October 22.
History
Last changed by/on | SAP | 20041209 |
SAP Release Created in | 111 |