SAP ABAP Data Element WRF_PPW_DATAM (Price Plan Valid On)
Hierarchy
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
   LO-MD-PPW (Application Component) Price Planning Workbench
     WRF_PPW_DDIC (Package) Price Planning Workbench - DDIC
Basic Data
Data Element WRF_PPW_DATAM
Short Description Price Plan Valid On  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PP Valid 
Medium 15 PPlan Valid On 
Long 20 Price Plan Valid On 
Heading 10 PP Valid 
Documentation

Definition

Date on which a price plan is valid. This means the date lies within thevalidity period that is specified in the header data of the price plan.

Use

This date is used to restrict the selection of price plans in the Price Planning Workbench. You can specify a single date or a time range for the validity date.

Restricting by this selection parameter is especially useful for promotion price plans, because they usually only have limited validity.

Dependencies

You can also use an interval to restrict the selection of price plans by validity start date.

Example

The examples below illustrate the possible scheduling of validity periods for price plans on the specified validity date or validity period.

  • Case 1: Specify a single day, such as 07/01/05

    Price plan 1 with validity from 06/01/05 - 08/31/05 will be considered.

    Price plans 2 and 3 with validity periods 01/01/05 - 05/30/2005 and 08/01/05 - 09/30/2005 will not be considered.

  • Case 2: Specify an interval, such as 06/01/05 - 07/31/05

    Price plan 1 with validity on 05/01/05 will be considered.

    Price plan 2 with validity from 05/01/05 - 09/30/05 will be considered.

    Price plan 3 with validity from 07/01/05 - 09/30/05 will be considered.

    Price plan 4 with validity from 06/15/05 - 06/30/05 will be considered.

    Price plans 5 and 6 with validity periods 01/01/05 - 05/30/2005 and 09/01/05 - 09/30/2005 will not be considered.

History
Last changed by/on SAP  20041209 
SAP Release Created in 111