SAP ABAP Data Element WRF_PPW_BUDG_STATUS_ORDER (Status Order of a Budget)
Hierarchy
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
   LO-MD-PPW (Application Component) Price Planning Workbench
     WRF_PPW_DDIC (Package) Price Planning Workbench - DDIC
Basic Data
Data Element WRF_PPW_BUDG_STATUS_ORDER
Short Description Status Order of a Budget  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR1    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 BgStatOrd. 
Medium 15 Budg.Stat.Ord. 
Long 20 Budget Status Order 
Heading 10 BgStatOrd. 
Documentation

Definition

In the standard system the status order represents the highest planning level that is 'primarily' responsible for the overall status of a budget.

The status order is determined by the default implementation of BAdI WRF_PPW_X_BG_STAT_E, method DET_BG_STAT_ORDER. The customer can influence the status order themselves by implementing their own BAdI.

Default Implementation of the Status Order

General logic for determining the status order

To determine the status order, the values of the planning levels are subtracted from the remaining budget successively and in descending order, that is, from planning level 3 to planning level 1. The status of each difference value is compared with the overall status of the budget. As soon as both statuses match, the current planning level used for the calculation defines the status order of the budget.

Special case - Overall budget status "ok"

If the overal budget status is "ok" (green traffic light), then in addition to the logic above, the system checks whether a price plan really exists in the relevant planning level. The planning level can only be used to determine the status order if there is a price plan. The status order is determined by the highest planning level in which there is a price plan. In the event that none of the price levels are assigned a price plan, the status order is given the value 'X'. This can happen, for example, at the start of a period when price plans have not yet been created for a budget. Another example, is if all price plans have already been activated and consequently do not correspond to any planning levels, but the overall budget status is still "ok".

Special case - Negative remaining budget

In the event that the remaining budget already has a negative value, the status order is given the value 'X' by default. This can, for example, occur when the exhausted budget from the previous period significantly exceeds the new budget value available for planning in the current period.

At this point, see the detailed documentation for the BAdI WRF_PPW_X_BG_STAT_E.

Use

Dependencies

In the standard system, the definition of the status order is directly linked to the definition of the budget status. This is determined by the BAdI WRF_PPW_X_BG_STAT_E, method DET_BG_INFO_STAT.

The status is determined according to the default implementation as follows:

If there is an absolute tolerance of XXX MU (monetary units) and an available budget of YYY MU, the overal budget status is:

1) "ok" (green traffic light), provided YYY >= 0MU

2) "ok with restrictions" (yellow traffic light), provided YYY < 0MU and 0MU < ABS(YYY) <= XXX

3) "Critical" (red traffic light) if YYY< 0 and 0 <= XXX < ABS(YYY)

Example

The following example is based on the determination of the status or status order delivered in the standard system (see above).

Status

If there is a fixed tolerance value of 10,000 MU (monetary units), then according to the default implementation, the following status rules apply to the available budget:

Overall budget status = "ok", provided available budget >= 0MU

Overall budget status = "ok with restrictions", provided -10,000MU <= available budget < 0MU

Overall budget status = "critical" if available budget < -10,000 MU

If there was an available budget of -60,000MU, the status would be "critical" and would be shown by a red traffic light.

Status order

We know there is an available budget of -60,000 MU (monetary units) with overall status "critical", if the fixed tolerance value is 10,000 MU. In addition:

Remaining budget = 100,000 MU

Total value planning level 3 = 80,000 MU

Total value planning level 2 = 50,000 MU

Total value planning level 1 = 30,000 MU

Procedure to determine status order

Step 1

Remaining budget - planning level 3 = 100,000 MU - 80,000 MU = 20,000 MU > 0 MU

=> Status (remaining budget - planning level 3) = "ok"

=> Status (remaining budget - planning level 3) <> overal status

=> Status order <> 3

Step 2

Remaining budget - planning level 3 - planning level 2

= 100,000 MU - 80,000 MU - 50,000MU

= - 30,000 MU < -10,000 MU

=> Status (remaining budget - planning level 3 - planning level 2) = "Critical"

=> Status (remaining budget - planning level 3 - planning level 2) = overall status

=> Status order = 2