SAP ABAP Data Element WFCS_PLDAT (Planning Date for Forecast)
Hierarchy
☛
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
⤷
MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷
WFCS (Package) IS-R: Sales Forecasting for Stores

⤷

⤷

Basic Data
Data Element | WFCS_PLDAT |
Short Description | Planning Date for Forecast |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PlngDate |
Medium | 15 | Planning date |
Long | 40 | Planning Date for Forecast |
Heading | 40 | Forcast Planning Date |
Documentation
Definition
The planning date defines when the forecast interprets the time sequences as forecasting periods. The date that is entered is converted to the first day of the relevant forecasting period.
Example
Planning date example:
- The planning date is Wednesday, September 6.
- The forecasting period is week.
As the forecasting period is week, the planning date is set to the start of the period, in this case Monday, September 4. All time series values before September 4 are interpreted as historic values and are regarded as such in the forecast that is run by the system.
All time series values after September 4 are regarded as 'future' time periods and are not therefore defined when the forecast is actually run by the system.
History
Last changed by/on | SAP | 20011002 |
SAP Release Created in | 46C |