SAP ABAP Data Element USMDZ1_LCKPSC (Lock Indicator for Plan Secondary Costs)
Hierarchy
MDG_FND (Software Component) MDG Foundation
   CA-MDG-APP-FIN (Application Component) MDG for Financials
     USMDZ1 (Package) Data Model
Basic Data
Data Element USMDZ1_LCKPSC
Short Description Lock Indicator for Plan Secondary Costs  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type USMDZ1_FLAG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plan Sec. 
Medium 20 Plan Secondary Costs 
Long 30 Plan Secondary Costs 
Heading PlnSec 
Documentation

Definition

Indicator that determines whether the cost center is locked against planning of secondary costs.

Use

If you select this indicator, you cannot plan secondary costs for the cost center.

Note that this indicator normally locks the cost center only against debits that include planning of secondary costs. Credits to the cost center in planning are possible.

Procedure

To also exclude sender cost centers from allocations, in Customizing you can change the message type of message GM 155 from I (information) to E (error).

You can change the message type in Customizing for Controlling under General Controlling -> Change Message Control. You enter GM as the Work Area. You can then create a new entry for message number 155. Note that this entry differs from the standard message type.

For more information, see Message Control.

Dependencies

Example

History
Last changed by/on SAP  20130604 
SAP Release Created in 605