Hierarchy

⤷

⤷

Basic Data
Data Element | USMDZ1_LCKPSC |
Short Description | Lock Indicator for Plan Secondary Costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | USMDZ1_FLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plan Sec. |
Medium | 20 | Plan Secondary Costs |
Long | 30 | Plan Secondary Costs |
Heading | 6 | PlnSec |
Documentation
Definition
Indicator that determines whether the cost center is locked against planning of secondary costs.
Use
If you select this indicator, you cannot plan secondary costs for the cost center.
Note that this indicator normally locks the cost center only against debits that include planning of secondary costs. Credits to the cost center in planning are possible.
Procedure
To also exclude sender cost centers from allocations, in Customizing you can change the message type of message GM 155 from I (information) to E (error).
You can change the message type in Customizing for Controlling under General Controlling -> Change Message Control. You enter GM as the Work Area. You can then create a new entry for message number 155. Note that this entry differs from the standard message type.
For more information, see Message Control.
Dependencies
Example
History
Last changed by/on | SAP | 20130604 |
SAP Release Created in | 605 |