SAP ABAP Data Element UBC_DT_PSIZE (Package Size)
Hierarchy
☛
FINBASIS (Software Component) Fin. Basis
⤷
FIN-FB (Application Component) Financials Basis
⤷
UBC_BASIS (Package) FSCM Biller Consolidator - Basis Functions

⤷

⤷

Basic Data
Data Element | UBC_DT_PSIZE |
Short Description | Package Size |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC6 | |
Data Type | NUMC | Character string with only digits |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Package |
Medium | 15 | Package Size |
Long | 20 | Package Size |
Heading | 11 | PackageSize |
Documentation
Definition
Package size for the transfer of cost events to the billing application.The package size is the number of cost events that can be transferred in a block to the BAdI (UBC_CE_TRANSFER).
The package size depends largely on the billing system used. The default value is that for the transfer of data to the SAP billing application Service Billing.
Use
Dependencies
Example
History
Last changed by/on | SAP | 20041006 |
SAP Release Created in | 200 |