SAP ABAP Data Element UBC_DT_CESTATE (Status of a Cost Event)
Hierarchy
FINBASIS (Software Component) Fin. Basis
   FIN-FB (Application Component) Financials Basis
     UBC_BASIS (Package) FSCM Biller Consolidator - Basis Functions
Basic Data
Data Element UBC_DT_CESTATE
Short Description Status of a Cost Event  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type UBC_DO_CESTATE    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Status 
Medium 15 Status 
Long 20 Status 
Heading Status 
Documentation

Definition

The status of a cost event defines its processing status. There are two types of status:

  • New (N)

    The cost event has been successfully created. A cost event is either created by the transfer of a cost event from a file or it is directly created in the system.

    When cost events are sent to the billing system, only the cost events with status "new" are processed.

  • Processed (P)

    Once the cost event is successfully transferred to the billing system, the status of the cost event changes from "new" to "processed."

    When cost events are deleted, only those with status "processed" are eligible for deletion.

Use

Dependencies

Example

History
Last changed by/on SAP  20041006 
SAP Release Created in 200