SAP ABAP Data Element TPM_KEY_DATE_INCL (Indicator for Including Key Date)
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷
FIN-FSCM-TRM-TM (Application Component) Transaction Manager
⤷
FTR_ACCRUAL (Package) Treasury: Accrual/Deferral of Profits
⤷
⤷
Basic Data
| Data Element | TPM_KEY_DATE_INCL |
| Short Description | Indicator for Including Key Date |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | TPM_DATE_INCL | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Incl.KeyDt |
| Medium | 15 | Incl. Key Date |
| Long | 40 | Including Key Date |
| Heading | 60 | Indicator for Including Key Date |
Documentation
Definition
This indicator shows whether or not the key date is within the time period in question.
Use
The time period is defined for the accrual/deferral function by the key date and the inclusion indicator for the key date.
Dependencies
Example
There are two interest flows, Z1 and Z2.
- Z1 is calculated from 1/1/01 through 12/31/01
- Z2 is calculated from 1/1/02 through 12/31/02
If you carry out an accrual/deferral with key date 01/01/02 with the inclusion indicator set to inclusive (technical value 1), Z2 is accrued/deferred for the calculation period "one day."
If the inclusion indicator is set to exclusive (technical value 0), Z1 is accrued/deferred for the calculation period [1/1/01; 12/31/01].
History
| Last changed by/on | SAP | 20030326 |
| SAP Release Created in | 200 |