SAP ABAP Data Element TPM_AMORT_END (Amortization to Final Due Date / Termination)
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷ FIN-FSCM-TRM-TM (Application Component) Transaction Manager
⤷ FTR_GENERAL (Package) CFM TM: Application Basis / Global Objects
⤷ FIN-FSCM-TRM-TM (Application Component) Transaction Manager
⤷ FTR_GENERAL (Package) CFM TM: Application Basis / Global Objects
Basic Data
Data Element | TPM_AMORT_END |
Short Description | Amortization to Final Due Date / Termination |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TPM_AMORT_END | |
Data Type | INT1 | 1-byte integer, integer number <= 255 |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Amort. to |
Medium | 20 | Amortization to |
Long | 25 | Amortization to |
Heading | 30 | Amortization to |
Documentation
Definition
This field controls how the final amortization date is calculated:
The following values are available:
- Amortization to end of term (securities/loans SAC) /end of fixed interest period (loans LAC): If you select this option for securities, the system takes the date of the last redemption payment as the final amortization date. For loans, the final amortization date is always the end of the fixed interest period defined in the loan condition. If this is zero, the system uses the end of the term for the condition. If this value is also zero, it takes the end of term date specified in the loan master data.
- Amortization to issuer's next termination date: For securities, the system determines the start date of the issuer's next notice period. If no such notice period exists, it takes the end of the term. For loans, the final amortization date is determined as above.
- Amortization to end of the fixed interest period (loans, LAC): For loans (LAC), the end of the fixed period is determined by the calculation of amortization running alongside operative loans accrual/deferral.
- Amortization to termination date (securities)/end of fixed period (loans): For securities, the system determines the start date of the issuer's next notice period. If no such notice period exists, it takes the end of the term. For loans, the end of the fixed period is determined from the master data.
History
Last changed by/on | SAP | 20020219 |
SAP Release Created in | 462_10 |