SAP ABAP Data Element TIMQUO_SIM (Projecting quota status)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PT (Application Component) Personnel Time Management
     PTIM (Package) HR Time Management Application Development
Basic Data
Data Element TIMQUO_SIM
Short Description Projecting quota status  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short Switch 
Medium Switch 
Long 35 Switch for quota projection 
Heading 39 Switch for quota projection 
Documentation

Definition

If the key dates for the selected person (entitlement and/or deduction) are greater than or equal to the recalculation date for Plant Data Collection (PDC) in the Payroll Status infotype (0003), then projection is switched on, triggering time accounting for this person (RPTIME00 run in simulation mode) up to the key date in question.

If the projection is switched off (that is, key date greater than or equal to the recalculation date for PDC), then the quota data from the Absence Quota infotype (2006) is read for key dates of this kind.

For key dates lesser than the PDC recalculation date, each of the existing time evaluation results are referenced (Cluster B2).

History
Last changed by/on SAP  19980728 
SAP Release Created in