Hierarchy
⤷ PY-BE (Application Component) Belgium
⤷ PC12 (Package) HR accounting: Belgium
Basic Data
Data Element | RUE |
Short Description | Street |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR30 | |
Data Type | CHAR | Character String |
Length | 30 | |
Decimal Places | 0 | |
Output Length | 30 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Street |
Medium | 15 | Street |
Long | 20 | Street |
Heading | 30 | Street |
Supplementary Documentation - RUECKJ 0000
Use
The period specifies up until when (as a minimum) the payroll results should be evaluated so that the supplementary pension messages can be generated.
Dependencies
Example
Supplementary Documentation - RUECKM 0000
Use
The period specifies up until when (as a minimum) the payroll results should be evaluated so that the supplementary pension messages can be generated.
Dependencies
Example
Supplementary Documentation - RUEK 1000
Definition
Use
Procedure
Enter the Confirmation key which needs to be set in the control key of an operation or phase, if process instructions are to be generated for this operation or phase.
Examples
Dependencies
Note
The system distinguishes between the entry of the initial value and the absence of an entry. In the latter case, the key is not taken into account.
Supplementary Documentation - RUEZT 0001
Use
Setup and teardown times are required to calculate the lot size dependent in-house production time. The system then uses the in-house production time to determine the planned dates for planned orders in materials planning.
Procedure
You can define work scheduling times in the material master record in one of two ways:
- Either you enter a lot size independent in-house production time.
- Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size. If required, you can get the system to update this value from the routing.
History
Last changed by/on | SAP | 20010720 |
SAP Release Created in |