SAP ABAP Data Element PTM_WRKDY (Check box for condition for planned hours)
Hierarchy
☛
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
⤷
PT (Application Component) Personnel Time Management
⤷
PTIM (Package) HR Time Management Application Development
⤷
⤷
Basic Data
| Data Element | PTM_WRKDY |
| Short Description | Check box for condition for planned hours |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Plnd hours |
| Medium | 15 | Planned hours |
| Long | 20 | Cond.for planned hrs |
| Heading | 5 | PlHrs |
Documentation
Definition
This checkbox determines whether the day rule should be valid on days with 0 planned hours or on days with more than 0 planned hours. Planned hours from an employee's personal work schedule are independent of the day type of the specified day.
Example
Select only the Plnd hours = 0 field if you only want the day rule to apply on days with a free daily work schedule.
History
| Last changed by/on | SAP | 19971012 |
| SAP Release Created in |