SAP ABAP Data Element PT_VORNR_RECEIVER (Activity Number)
Hierarchy
☛
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
⤷ PT-RC (Application Component) Time Data Recording and Administration
⤷ PT_TMW_BASICS (Package) TMW: Objects from UIA and APPLICATION (Core)
⤷ PT-RC (Application Component) Time Data Recording and Administration
⤷ PT_TMW_BASICS (Package) TMW: Objects from UIA and APPLICATION (Core)
Basic Data
Data Element | PT_VORNR_RECEIVER |
Short Description | Activity Number |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | VORNR | |
Data Type | CHAR | Character String |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | VGN | |
Default Component name | ACTIVITY | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Activity |
Medium | 15 | Activity |
Long | 20 | Activity |
Heading | 4 | Act |
Documentation
Definition
Specifies the order in which activities in a sequence are executed.
Use
Enter the network activity to be debited.
Dependencies
For cost assignment, the network activity is debited with the actual costs from payroll.
For activity allocation, the sender network activiy is debited with the allocation costs determined in Controlling.
Example
History
Last changed by/on | SAP | 19991110 |
SAP Release Created in |