SAP ABAP Data Element PRIVALIDITYCHMG (PRICAT: Valid-From Date for Items in Engin. Change Managemnt)
Hierarchy
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
   SD-EDI (Application Component) Electronic Data Interchange
     VPRI (Package) Application Development R/3 Retail/CP EDI messages
Basic Data
Data Element PRIVALIDITYCHMG
Short Description PRICAT: Valid-From Date for Items in Engin. Change Managemnt  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name VALIDITYDATE   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Valid from 
Medium 15 Valid from 
Long 20 Valid-from items 
Heading Valid 
Documentation

Definition

Date from which the items in are valid in Engineering Change Management.

Use

Each catalog item has a "Valid-from" date. When you create a new catalog, this date is determined from the assortment module assignment if you do not explicitly enter a "Valid-from" date. The "Valid-from" date can be changed manually in catalog maintenance.

If you want a history of the items, the date determined by Engineering Change Management must be different to the "Valid-from" date in the catalog. As it is not likely that you will want to change the date manually for each item, you can enter a date here that is to be used as the "Valid-from" date for the items. If you do not enter a date, the system uses the current date. So that the date is changed, you must have selected the indicator "Use valid-from date".

There are therefore three ways of defining the "Valid-from" date:

  • The Valid-from date for the assortment is used (appropriate if you do not need a history)
  • The Valid-from date in Engineering Change Management is used
  • The current date is used as the Valid-from date for Engineering Change Management

History
Last changed by/on SAP  20020417 
SAP Release Created in