Hierarchy
⤷ PY-PT (Application Component) Portugal
⤷ PC19 (Package) HR settlement: Portugal
Basic Data
Data Element | PPT_PWPSW |
Short Description | "Pay-when-possible" switch for vacation allowance payments |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | When |
Medium | 15 | Pay-when-poss. |
Long | 20 | Pay-when-possible |
Heading | 4 | When |
Documentation
Definition
If set, it indicates that the payment must be made when possible, that is, immediately after the earliest payment date or before the latest payment date.
If not set, the system chooses another leave reference period for the vacation payment - after the earliest date or before the latest date - such as the period before the second longest vacation.
Example
The company pays the vacation allowance before the longest leave period. Employee R's salary is 1100 EUR. She plans to take 12 vacation days in March and 10 days in September, therefore the system must pay the vacation allowance in February. However, since the company has decided that March is the earliest month possible for vacation allowance payments, the payment must occur either in March (as soon as possible) or in August (before the next longest vacation period), depending if the flag Pay-when-possible is activated or not.
History
Last changed by/on | SAP | 20010820 |
SAP Release Created in |