SAP ABAP Data Element PIQSI2S_DEGRELY (Degree of Performance Index Reliability)
Hierarchy
☛
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
⤷ IS-HER-CM-AD (Application Component) Administration
⤷ PMIQ (Package) Campus Management
⤷ IS-HER-CM-AD (Application Component) Administration
⤷ PMIQ (Package) Campus Management
Basic Data
Data Element | PIQSI2S_DEGRELY |
Short Description | Degree of Performance Index Reliability |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PROZENT | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Reliablty |
Medium | 19 | Deg. of Reliability |
Long | 20 | Deg. of Reliability |
Heading | 19 | Deg. of Reliability |
Documentation
Definition
Specifies whether all the values the system requires to calculate the performance index are available. This set of values is the referred to as the calculation basis.
Use
The system determines the degree of reliability while calculating the performance index as follows:
- The system sets the degree of reliability to 100 percent if all of the values it requires to calculate the performance index are available (calculation basis is complete).
- The system sets the degree of reliability to a value below 100 percent if not all of the values it requires to calculate the performance index are available (calculation basis is incomplete).
The calculation basis is considered incomplete if the modules included in the calculation have not been assigned a grade.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 464 |