SAP ABAP Data Element PIQPROG_GR_VALID_FROM_INTERN (Set Valid-From Date for Progression Result)
Hierarchy
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
   IS-HER-CM-AD (Application Component) Administration
     PMIQ (Package) Campus Management
Basic Data
Data Element PIQPROG_GR_VALID_FROM_INTERN
Short Description Set Valid-From Date for Progression Result  
Data Type
Category of Dictionary Type     Direct Type Entry
Type of Object Referenced     No Information
Domain / Name of Reference Type      
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Set 
Medium 20 Set Valid-From Date 
Long 22 Set Valid-From Date 
Heading 22 Set Valid-From Date 
Documentation

Definition

Specifies the date which is set in the valid-from date field for the given check period.

Use

The set valid-from date can differ from the actual valid-from date if the valid-from date of the result for a check period is after the valid-from date of the result for a later check period.

Example

On July 1 of each year, you run program type progression. The first progression run for the student Susan Mitchell took place on 01.07.2001; the result of this run is valid from 01.07.2001.
The second progression run took place on 01.01.2002; the result of this run is valid from 01.07.2002.
The third progression run took place on 01.07.2002; the result of this run is valid from 01.07.2002.

The system shows the following data in Susan Mitchell's progression result history:

Check Period    Valid From    Valid To    Set

1    01.07.2001    30.06.2002    01.07.2001

2    ----------    ----------    01.07.2002

3    01.07.2002    31.12.9999    01.07.2002

The system does not display a valid-from or valid-to date for the second check period.

Note

The initial valid-to date of the result for a check period is always 31.12.9999. It changes when a progression result becomes available.

History
Last changed by/on SAP  20050224 
SAP Release Created in