SAP ABAP Data Element PIQPROG_GR_VALID_FROM (Valid-From Date for Progression Result)
Hierarchy
☛
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
⤷
IS-HER-CM-AD (Application Component) Administration
⤷
PMIQ (Package) Campus Management
⤷
⤷
Basic Data
| Data Element | PIQPROG_GR_VALID_FROM |
| Short Description | Valid-From Date for Progression Result |
Data Type
| Category of Dictionary Type | Direct Type Entry | |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | ||
| Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
| Length | 8 | |
| Decimal Places | 0 | |
| Output Length | 10 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Valid From |
| Medium | 20 | Valid From |
| Long | 22 | Valid-From Date |
| Heading | 22 | Valid-From Date |
Documentation
Definition
The date as of which the progression result applies for the student.
Supplementary Documentation - PIQPROG_GR_VALID_FROM0001
Use
The validity start date must not be before the check-to date; it must be higher than or identical to the check-to date.
The system proposes the day after the check-to date as the validity start date.
Dependencies
Example
History
| Last changed by/on | SAP | 20050224 |
| SAP Release Created in | 464 |