SAP ABAP Data Element PIQPROG_GR_RESULT_STATUS_T_ACT (Status of Current Result (Description))
Hierarchy
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
   IS-HER-CM-AD (Application Component) Administration
     PMIQ (Package) Campus Management
Basic Data
Data Element PIQPROG_GR_RESULT_STATUS_T_ACT
Short Description Status of Current Result (Description)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type TEXT15    
Data Type CHAR   Character String 
Length 15    
Decimal Places 0    
Output Length 15    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 CurrRsltSt 
Medium 20 Curr. Result Status 
Long 38 Current Result Status (Description) 
Heading 38 Current Result Status (Description) 
Documentation

Definition

The result status defines whether a progression result is final, pending, or projected.

Dependencies

The system determines the progression result status automatically based on the progression rules defined in the system.

The result statuses have the following meaning:

  • 1 - final:

    The system could definitively determine the final progression result.

  • 2 - pending:

    The system could not definitively determine the final progression result, for example, because the follow-up activities have not yet been performed for all module bookings.

  • 3 - projected:

    The system could not definitively determine the final progression result, for example, because the follow-up activities have not yet been performed for all module bookings and the given check-to date is in the future.




History
Last changed by/on SAP  20050224 
SAP Release Created in 471