SAP ABAP Data Element PIQPROG_GR_RESULT_GT_OP (New Progression Result (Description))
Hierarchy
☛
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
⤷ IS-HER-CM-AD (Application Component) Administration
⤷ PMIQ (Package) Campus Management
⤷ IS-HER-CM-AD (Application Component) Administration
⤷ PMIQ (Package) Campus Management
Basic Data
Data Element | PIQPROG_GR_RESULT_GT_OP |
Short Description | New Progression Result (Description) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TEXT30 | |
Data Type | CHAR | Character String |
Length | 30 | |
Decimal Places | 0 | |
Output Length | 30 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | NewPrgRslt |
Medium | 19 | NewProgRslt |
Long | 37 | New Progression Result |
Heading | 49 | New Progression Result (Description) |
Documentation
Definition
Specifies the new progression result to be set.
Dependencies
In addition to the new progression result, you must enter a check-to date and a valid-from date.
The system proposes the new progression result based on the given circumstances:
- If you call the progression application from within application processing (for example while editing an admission application), the system proposes the submitted progression result specified in the application.
- If the application does not contain a submitted progression result, the system proposes the system progression result determined in the VSR rules.
- If you call the progression application from outside of application processing, the system proposes the system progression result determined in the VSR rules.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 471 |