SAP ABAP Data Element PIQPROG_GR_RESULT_G_OP (New Progression Result)
Hierarchy
☛
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
⤷
IS-HER-CM-AD (Application Component) Administration
⤷
PMIQ (Package) Campus Management
⤷
⤷
Basic Data
| Data Element | PIQPROG_GR_RESULT_G_OP |
| Short Description | New Progression Result |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CHAR4 | |
| Data Type | CHAR | Character String |
| Length | 4 | |
| Decimal Places | 0 | |
| Output Length | 4 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | NewPrgRslt |
| Medium | 18 | New Prog. Result |
| Long | 37 | New Progression Result |
| Heading | 37 | New Progression Result |
Documentation
Definition
Specifies the new progression result to be set.
Dependencies
In addition to the new progression result, you must enter a check-to date and a valid-from date.
The system proposes the new progression result based on the given circumstances:
- If you call the progression application from within application processing (for example while editing an admission application), the system proposes the submitted progression result specified in the application.
- If the application does not contain a submitted progression result, the system proposes the system progression result determined in the VSR rules.
- If you call the progression application from outside of application processing, the system proposes the system progression result determined in the VSR rules.
History
| Last changed by/on | SAP | 20050224 |
| SAP Release Created in | 471 |