SAP ABAP Data Element PIQPROG_GR_PROCESSTYPET (Execution Category Used in Progression (Description))
Hierarchy
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
   IS-HER-CM-AD (Application Component) Administration
     PMIQ (Package) Campus Management
Basic Data
Data Element PIQPROG_GR_PROCESSTYPET
Short Description Execution Category Used in Progression (Description)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type TEXT20    
Data Type CHAR   Character String 
Length 20    
Decimal Places 0    
Output Length 20    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Execution 
Medium 19 Exec. Cat. (Desc.) 
Long 20 Exec. Cat. (Desc.) 
Heading 19 Exec. Cat. (Desc.) 
Documentation

Definition

Defines the mode in which progression is executed for the program type.

Use

The system offers the following execution categories for progression:

  • Initialize

    Requirements: No progression data exists for the student in the specified program type.

    Use: The initial progression run provides the basis for progression runs with other execution categories.

  • New

    Requirements:

    1. An initial progression run was executed.
    2. No progression data exists for the check-to date.

      Use: The system determines a new progression result.

  • Repeat

    Requirements:

    1. An initial progression run was executed.
    2. Progression data already exists for the check-to date.
    3. The system uses the check-to date of the last progression run.
    4. Only the last progression run may be repeated. Progression runs before the last run cannot be repeated.

      Use: The system recalculates progression for the check-to date specified in the last progression run.

  • Automatic

    Use: The system automatically determines the correct execution category (initialize, new, or repeat).

  • Manual

    Requirements: An initial progression run was executed.

    Use: Depending on which check-to date you enter, the system either overwrites the existing progression result with manually entered values or it creates a new progression result with these values.

  • Reset

    Requirements: An initial progression run was executed.

    Use: The system resets the progression results of all check periods that overlap with the specified check-to date or are after this check-to date. Check periods whose check-to dates are before the specified check-to date are not taken into account.

History
Last changed by/on SAP  20050224 
SAP Release Created in 464