Hierarchy
⤷
⤷
Basic Data
| Data Element | PIQPROG_GR_PROCESSTYPET |
| Short Description | Execution Category Used in Progression (Description) |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | TEXT20 | |
| Data Type | CHAR | Character String |
| Length | 20 | |
| Decimal Places | 0 | |
| Output Length | 20 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Execution |
| Medium | 19 | Exec. Cat. (Desc.) |
| Long | 20 | Exec. Cat. (Desc.) |
| Heading | 19 | Exec. Cat. (Desc.) |
Documentation
Definition
Defines the mode in which progression is executed for the program type.
Use
The system offers the following execution categories for progression:
- Initialize
Requirements: No progression data exists for the student in the specified program type.
Use: The initial progression run provides the basis for progression runs with other execution categories.
- New
Requirements:
- An initial progression run was executed.
- No progression data exists for the check-to date.
Use: The system determines a new progression result.
- Repeat
Requirements:
- An initial progression run was executed.
- Progression data already exists for the check-to date.
- The system uses the check-to date of the last progression run.
- Only the last progression run may be repeated. Progression runs before the last run cannot be repeated.
Use: The system recalculates progression for the check-to date specified in the last progression run.
- Automatic
Use: The system automatically determines the correct execution category (initialize, new, or repeat).
- Manual
Requirements: An initial progression run was executed.
Use: Depending on which check-to date you enter, the system either overwrites the existing progression result with manually entered values or it creates a new progression result with these values.
- Reset
Requirements: An initial progression run was executed.
Use: The system resets the progression results of all check periods that overlap with the specified check-to date or are after this check-to date. Check periods whose check-to dates are before the specified check-to date are not taken into account.
History
| Last changed by/on | SAP | 20050224 |
| SAP Release Created in | 464 |