SAP ABAP Data Element PIQPROG_GR_KEY_DATE (Valid From Date for Progression)
Hierarchy
☛
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
⤷
IS-HER-CM-AD (Application Component) Administration
⤷
PMIQ (Package) Campus Management

⤷

⤷

Basic Data
Data Element | PIQPROG_GR_KEY_DATE |
Short Description | Valid From Date for Progression |
Data Type
Category of Dictionary Type | Direct Type Entry | |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ||
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Valid From |
Medium | 15 | Valid From |
Long | 20 | Valid From |
Heading | 9 | Valid Fr. |
Documentation
Definition
Key date as of which the module booking is to be included in progression.
Use
The key date must be between the check-from date and the check-to date of the check period in which the module booking is to be included in the progression run.
Note
If you want to include a module booking in the progression run of a future check period, the date you enter must satisfy the following criteria:
This date must be after the check-to date of the check periods you do not want to include in the progression run and before the check-to date of the relevant check period.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 464 |